Bringing certainty to project cost.

Quantified cost and schedule risk analysis for infrastructure programmes. Built for the people who have to defend the number.

Cost exposure, all risks8,000 iterations
P0P20P40P60P80P100P50 £1.56mP80 £2.47m£1.00m£2.00m£3.00m£4.00m£5.00m

Hover the curve to read any confidence level

P50
£1.56m
P80
£2.47m
Risks modelled
6

Aligned with the frameworks infrastructure programmes already run on

  • ISO 31000
  • APM
  • National Grid

A risk register is not a risk analysis.

Most programmes track risk in a spreadsheet: a list of things that might go wrong, each with a number someone typed in. It cannot tell you what the portfolio costs at 80% confidence, which five risks drive most of the exposure, or what the contingency should actually be.

CARDO runs the register through simulation instead. Same risks, same estimates, but the output is a distribution you can defend at a board meeting rather than a total you have to justify.

Three analyses, one register

Cost, schedule and the register itself stay in the same system, so the numbers in a report all came from the same place.

Cost risk analysis

Runs the register through 20,000 iterations to produce confidence curves, histograms and a sensitivity ranking, with results rolled up through every level of the work breakdown structure.

Monte Carlo simulation over the whole portfolio.

Schedule risk analysis

Imports a P6 or Microsoft Project programme, runs critical path analysis and schedule simulation, and reports joint confidence on cost and completion together.

Risk register

Threats and opportunities with pre and post mitigation estimates, WBS-coded cost lines, key assumptions and governance fields. Every edit writes an immutable change log entry.

And the parts that make those work

WBS explorer
Browse the work breakdown structure with simulated risk cost rolled up to each element, so exposure can be traced from portfolio total down to a single package.
Rates library
A managed rate card behind every cost line, so estimates are built from labour, plant and materials rather than typed in as a lump sum.
Director reports
Generates a PDF report with the curves, the top exposures and written commentary, scoped to the whole programme or a single part of the breakdown.
AI mitigation assessmentEarly access
Submit actions, controls and fallback, and get a structured residual estimate with a confidence rating and gap analysis. A risk manager reviews it and accepts or rejects it; nothing is applied automatically.

Access is by invitation.

CARDO is rolled out with each organisation rather than sold by the seat. Tell us about your programme and we will arrange a walkthrough.

Reviewing us for procurement? Start at the security overview.