One register, analysed properly.

Kamba Risk keeps the register, the estimating basis, the simulation and the reporting in one system, so the number in a board pack can be traced back to the risk that produced it.

How a programme moves through it

  1. Capture the register

    Threats and opportunities with pre and post mitigation estimates, WBS-coded cost lines and governance fields. Every edit is attributed and timestamped.

  2. Estimate from first principles

    Cost lines are built from a managed rate card rather than typed in as lump sums, so an estimate can be interrogated rather than defended on authority.

  3. Simulate

    The register runs through Monte Carlo simulation for cost, and against your imported programme for schedule, producing confidence curves and a sensitivity ranking.

  4. Check against comparable projects

    Reference class forecasting asks how similar completed projects actually finished against their estimates at the same stage, and how confident you can be in the contingency you hold.

  5. Report

    Output a board-ready PDF with the curves, the top exposures and written commentary, scoped to the programme or to one part of the breakdown.

What is in the box

Each part is available according to the role a person holds, so a viewer sees the analysis without being able to alter the basis of it.

Risk register

Threats and opportunities with pre and post mitigation estimates, WBS-coded cost lines, key assumptions and governance fields. Every edit writes an immutable change log entry.

Cost risk analysis

Runs the register through Monte Carlo simulation, 10,000 iterations by default, to produce confidence curves, histograms and a sensitivity ranking, with results rolled up through every level of the work breakdown structure.

Schedule risk analysis

Imports a P6 or Microsoft Project programme, runs critical path analysis and schedule simulation, and reports joint confidence on cost and completion together.

Reference class forecasting

Early access

Compares the contingency and float you hold with how comparable completed projects turned out against their estimates at the same stage of maturity. Draw on your own project history, curves you are licensed to use, or public projects found by AI research that a person has reviewed and accepted. Each source is shown side by side and never merged into one figure.

WBS explorer

Browse the work breakdown structure with simulated risk cost rolled up to each element, so exposure can be traced from portfolio total down to a single package.

Rates library

A managed rate card behind every cost line, so estimates are built from labour, plant and materials rather than typed in as a lump sum.

Director reports

Generates a PDF report with the curves, the top exposures and written commentary, scoped to the whole programme or a single part of the breakdown. With reference class forecasting, adds an outside-view report and a report that sets the risk models beside comparable past projects.

AI mitigation assessment

Early access

Submit actions, controls and fallback, and get a structured residual estimate with a confidence rating and gap analysis. A risk manager reviews it and accepts or rejects it; nothing is applied automatically.

Built on the methods your assurance team already expects

The process follows established risk management practice rather than a proprietary method, so output stands up in an assurance review.

  • ISO 31000

    Risk management principles and process

  • APM

    Association for Project Management guidance

See it against your own programme

Try it free for 30 days on a live register, or book a walkthrough that uses your register and breakdown structure rather than a demo dataset.